List of applicable documents

Space Application Services

Applicable /Reference Document  Reference Format Notes 
Payload Safety Policy and Requirements for International Space Station. SSP 51700 PDF Applicability and verification matrix tailored by ICE Cubes Service for the Experiment Cube, three weeks after B.2
ICF to Experiment Cube Interface Requirements Document ICU-SA-RQ-004 PDF Includes verification matrix
Guidelines to design of ICE Cubes Experiments ICU-SA-TN-011 PDF  
ICE Cubes Service Operations Manual ICU-SA-MA-003 PDF  
Experiment Cube Monitor and Control Software Users Guide ICU-SA-MA-004 PDF  
Out-Of-The-Box Monitor and Control Software N/A Code  
Template for EFSDP Phase 0 (presentation) N/A PPT  
Template  for Experiment Cube’s Questionnaire N/A WORD  
Template for Experiment Cube to ICE Cubes Service ICD ICU-SA-ICD-002 WORD  
Template for Collection of Experiment Cube Safety-Related Data ICU-SA-TN-028 WORD  
Template for Experiment Cube Components List ICU-SA-LI-013 WORD  
Template for Experiment Cube Materials List ICU-SA-LI-014 WORD  
Template for Experiment Cube Process List ICU-SA-LI-015 WORD  

Space Application Services

Documents to be produced by the customer Reference (1) Format Due Date Remarks
Experiment Cube to ICE Cubes Service ICD ICU-SA-ICD-xxx WORD + PDF

L-6 months

L-3 months

 
Collection of Safety Related Data * ICU-SA-TN-xxx WORD + PDF

L-6 months

L-3 months

 
Experiment Design/Operations Description and Verification Plan  ICU-SA-RP-xxx WORD + PDF

L-9 months

L-5 months

Can be a single document or split in various documents
Experiment Cube Declared Components List ICU-SA-LI-xxx WORD + PDF

L-6 months

 

 
Experiment Cube Declared Materials List ICU-SA-LI-xxx WORD + PDF

L-6 months

 

 
Experiment Cube Declared Process List ICU-SA-LI-xxx WORD + PDF

L-6 months

 

 
Analysis Reports as necessary for interface- and safety-related verifications ICU-SA-RP-xxx WORD + PDF L-6 months Depending on the experiment‘s characteristics
Test Reports as necessary for interface- and safety-related verifications ICU-SA-RP-xxx WORD + PDF L-3 months Depending on the experiment’s characteristics
Ancillary info necessary for shipping to Launch Site        

*   To be updated for each of the three steps of the Safety Review Process

European Space Agency

ESA standards and processes

Title Reference Issue Date
ISS Payloads: Tailoring of Project Review Requirements ISS-ESA-RQ-003 1 19-04-2016
Product Assurance and Safety Requirements for ISS Pressurized Payloads ESA-HRE-IPL-RQ-0002 1 13/12/2016
DOCUMENTATION REQUIREMENTS FOR ISS PAYLOADS ESA-HRE-IPL-RQ-0003 Draft  
Inventory Control Procedure MS-ESA-PR-101 1 23-01-1995
Verification Requirements Document MS-ESA-RQ-011 2D 01 July 1997

Project Planning and Implementation

 

ECSS-M-ST-10C Rev.1 06 March 2009
Structural Finite Element Models ECSS-E-ST-32-03C C 31 July 2008
Materials ECSS-E-ST-32-08C C 31 July 2008
Space Engineering –Mechanism ECSS-E-ST-33-01C C 06 March 2009
Software Engineering ECSS-E-ST-40 C 06 March 2009
Organisation and Conduct of Reviews ECSS-M-ST-10-01 C November 2008
Configuration and Information management ECSS-M-ST-40C Rev.1  
Risk Management (note Project always to check for Ad hoc costing requirements) ECSS-M-ST-80C C 31 July 2008
Relevant ESR      
Training Model Requirements MSM-AT-CPT-GNL-RQ-001 1/1 30-03-2001

Additional Applicable Documents

The following documents shall be applicable as a complement of the other  applicable documents. Any conflict between contents of the applicable documents shall be promptly reported to ESA for resolution. 

Title Reference Issue Date

Structural Design and Verification of Pressurised Hardware

 

ECSS-E-ST-32-02C C 15-Nov-2008

Structures General Requirements Standard

 

ECSS-E-ST-32C C 15-Nov-2008
Factors of Safety Standard ECSS-E-ST-32-10C C Rev.1 06-Mar-2009

 ISS integration

Title Reference Issue Date
Columbus Pressurized Payloads Interface Requirements Document + related IRN’s COL-RIBRE-SPE-0164 2A 15.11.2013
COLUMBUS Pressurized PL Generic PL Verification Plan+ IRN’s COL-RIBRE-PL-0144 2A 1-12-2010
Operations Data File Standards Check issue SSP 50253 R Dec 2010
Cold Stowage Interface Requirements Document

SSP 57070

Check with AK which document replaces it

B April 2010
Pressurized Payloads Interface Requirements Document SSP-57000 Rev R Oct.2015
KUBIK Power Supply in Stand-Alone KI-KuPS-IRD-073 Issue  1 27-06-2011
Commercial-Off-the Self Interface  Certification requirements and Guidelines for System and Payload End Items SSP 50986 Baseline(Draft) 2-03-2015

Requirements for Hard-Mounted Cargo Transported on SOYUZ and PROGRESS 

Title Reference Issue Date
Requirements for International Partner Cargo Transported on Russian PROGRESS and SOYUZ Vehicles P32928-103   2004

Requirements for Hard-Mounted Cargo Transported on Space-X

C3-1 Vehicle Interface Definition Document  SPX-00001047 Appendix 24  

Requirements for Hard-Mounted Cargo Transported on HTV

Title Reference Issue Date
HTV Cargo Standard Interface Requirements Document (For Rack Level Cargo in Pressurized Logistic Carrier)

NASDA-ESPC-2857

Part 1 Volume 2 

Rev. C July 12, 2009

Rate this

  • Currently 4 out of 5 Stars.
  • 1
  • 2
  • 3
  • 4
  • 5