September 2002

...
20.09.02 Final assembly work on Proton’s first 3 stages for IntegralAccess the image
...
21.09.02. Dressed in SCAPE suits preparing for fuellingAccess the image
...
21.09.02 Dressing in the Scape suitAccess the image
...
21.09.02 Fuelling operations being checked on the monitorsAccess the image
...
21.09.02. Test conductorsAccess the image
...
21.09.02. Back-up teamAccess the image
...
21.09.02 The observer team, double-checking the completion of the step-by-step procedureAccess the image
...
30.09.02. Sailing across the clean roomAccess the image
...
30.09.02 Integral approaches the gantryAccess the image

Rate this

  • Currently 0 out of 5 Stars.
  • 1
  • 2
  • 3
  • 4
  • 5
Rating: 0/5 (0 votes cast)

Thank you for rating!

You have already rated this page, you can only rate it once!

Your rating has been changed, thanks for rating!

Views

780